Skip to main content

ADVERTISEMENT

David R. Thistlethwaite, AIA

05/01/2008
The next step in the development of the new EP lab was the selection of the Design-Build team. Design-Build is a project delivery method that involves combining the architect and engineers with a general contractor to not only design the...
The next step in the development of the new EP lab was the selection of the Design-Build team. Design-Build is a project delivery method that involves combining the architect and engineers with a general contractor to not only design the...
The next step in the development...
05/01/2008
EP Lab Digest